MEICA Consulting Engineers Ltd provide numerous into the services to clients in the Pharmaceutical Sector.
Our team has expertise and experience in:
​
-
Project Management & Construction Management.​
-
Asset Management​.
-
Mechanical & HVAC Design.​
-
Electrical & Instrumentation Design.​
-
Contractor Tender Pack Preparation & Evaluation.
-
Construction Support & Supervision​.
-
Validation.
-
Quality Control & Quality Assurance.​
-
FAT DQ, IQ OQ and PQ Documentation.​
-
HAZOPs & Process Supervisor Design Process.
-
Compressed Air Design.
-
Wastewater Process & Plant Design.
-
Water Process Systems.
-
Support to Wastewater Plant Operation.
-
Health & Safety Support.
-
Environmental Management Support.

Bristol Myers Squibb - Cruiserath
2,000m2 of HVAC per week. 42,000m2 total.
MEICA Consulting Engineers Ltd was commissioned by our client, the Ducting Contractor for the entire site to provide Quality Management, Testing and Commissioning Services to them.
The construction of Bristol Myers Squibb’s (BMS) new facility represented the largest ever capital investment for the American bio-pharma company and was the first biologics drug substance facility built by the industry giant outside of the United States.
​
A major project, BMS sought an experienced pharma HVAC provider with specialist knowledge of the pharma sector who could deliver at scale to a significantly compressed schedule.
Compressed Schedule Delivery Of 42,000m2 Of HVAC Services
​
Our staff were co-located with our client for this project. We worked on 40,000m2 of ducting across the main process / production facility and the Central Utilities Building. All ducting was to designed, installed and commissioned in accordance with the standard DW 144. All submitted Quality, Test and Commissioning documentation had to meet the requirements of Good Documentation Practice.
Our client were trusted with early design integration, installation and testing of 42,000m2 of HVAC services across two buildings: 6,000m2 in the central utilities building, and a further 36,000m2 in parallel in the large-scale cell structure (LSCC).
This ambitious schedule demanded the installation and commissioning support of an average of 2,000m2 of equipment and HVAC services per week, which was fully supported by our off site fabrication workshop.
​
The project was successfully delivered on schedule.
Pharmaceutical Client - Wastewater Treatment Plant
MEICA Consulting Engineers Ltd were engaged by a Pharmaceutical Client for the Design, Tendering and Site Supervision with Technical Support of the new Wastewater Treatment Plant on their Manufacturing Site. The main design includes a Moving Bed Biofilm Reactor (MBBR) system. We provided the Process and MEICA Works design. This system was selected for its advantages in:
• Energy and operational cost efficiency
• Reduced reactor volume and hydraulic retention time
• Simplified control systems with a compact footprint.
​
The Process MEICA elements of the project involved the design, procurement and site supervision for:
• Inlet works, including screens and auger
• Balance, pH Control, aeration, settlement and sludge holding tanks
• MCC kiosk, including electrical and mechanical installations
Substantial complete has been successfully achieved by the Contractor for the installation and Pre-Commissioning works in accordance with the Client’s schedule. Commissioning is presently in progress. The programme was achieved by dynamic, positive collaboration by all project partners throughout.​