top of page

WATER

Uisce Eireann Projects

​

MEICA Consulting Engineers Ltd while providing Resident Engineering Services on behalf of Uisce Eireann working with various Employer Representatives and Contractor's on multiple water and wastewater projects have provided the following services:

​

  1. Review of Contractor's Mechanical & Electrical  Building Services design.

  2. Provide technical advice and support to the Employer's Representative for M&E Building Services design and requirements of Part L of the Building Codes.

  3. Develop with the Contractor and Assigned Certifier the M&E Building Services BCAR Inspection Test Plan.

  4. Review all the M&E Building Services ancillary for the Assigned Certifier.

  5. Onsite Supervision of  the Contractor's implementation of M&E Building Services BCAR Inspection Test Plan.

  6. Review of Contractor's design for standby generation, (Diesel).

  7. Onsite Supervision of the Contractor's installation and commissioning of standby generation

​​

​​

We have provided this service on the following water projects:

​

  • Osberstown  Sludge Hub.

  • Upper Liffey Valley Pipeline 2B - Monread Wastewater Pumping Station, (WWPS), Clane WWPS and Sallins WWPS.

  • Upper Liffey Valley Pipeline 2A - Kilbelin WWPS, Little Connell WWPS and New Hall WWPS.

  • Windmill Hill Reservoir Control Building.

  • Brannockstown Water Pumping Station.

​

​

© 2025 by MEICA Consulting Engineers Ltd. All rights reserved.